www.trusteddocks.com

Compare Shipyards

Knots
MT per day
USD per MT
USD per day
Shipyard name HUANGHAI SHIPBUILDING LTD CORP YANTAI CIMC RAFFLES OFFSHORE LIMITED
Location
Shidao, China
Yantai, China
Dimensions Max. Length: 200.0m / 656.2ft  | Max. Width: 32.0m / 105.0ft Max. Length: 380.0m / 1,246.7ft  | Max. Width: 205.0m / 672.6ft  | Max. Draft: 14.0m / 45.9ft
HUANGHAI SHIPBUILDING LTD CORP
YANTAI CIMC RAFFLES OFFSHORE LIMITED
Services
  • New Buildings
  • New Buildings
Certificates
Description

Founded in 1944, Huanghai Shipbuilding Co., Ltd is one middle-sized shipbuilding and ship repairing company. The company own 2500 employees and registered capital of RMB 1 billion, 80% hold by the employee, 20% by the Rongcheng Public Asset Limited.The Shipyard covers a land area of 830,000 square meters (including new shipyard), various vessels up to 50,000DWT can be built and repaired and our major products are Multi-purpose Heavy-lift vessels, RoPax, Container vessels, Bulk Carriers,Offshore vessels and kinds of fishing vessels. Our products spread to all over in China, Pacific Rim nations, Africa and Europe.more

As a deep-water offshore equipment designer and builder, Yantai CIMC Raffles Offshore Ltd (CIMC Raffles) owns three offshore construction yards located in Yantai, Haiyang and Longkou, employing a total of 3,000 people. To date, CIMC Raffles has delivered seven deep-water semisubmersible drilling rigs; its current construction projects account for 21% of global market share. In September 2014, CIMC Raffles was listed on the shipbuilder whitelist published by Ministry of Industry and Information Technology of the People’s Republic of China. Its high-end deep-water semisubmersible drilling rigs include the GM4-D, which can operate in Arctic water: its seventh-generation D90 ultra-deep-water semisubmersible drilling rig holds depth records in operation and drilling. Bulk-delivered jack-ups and production platforms will be operated in Mexico and South East Asia areas, while its North Sea deep-water rigs have earned six ‘Rig of the Month’ titles from the Norwegian national oil company, Statoil. The company also owns CIMC Offshore Engineering Institute (CIMC OEI), regarded as the national offshore oil energy drilling rig research centre. Employing 800 engineers, it is the PhD practice base for Harbin Institute of Technology, Ocean University of China. In 2013, CIMC Group took over well-known Swedish design company Bassoe Technology (BT), combining CIMC OEI’s project experience with BT’s comprehensive concept and basic design capabilities, and strengthening Asian-European research methodology.more

Facilities
Type Name Length [m/ft] Width [m/ft] Draft [m/ft] Lifting capacity [t] Max crane SWL [t] Num. Cranes
Slipway Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Slipway Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Slipway Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Slipway Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Slipway Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Outfitting pier Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Outfitting pier Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Outfitting pier Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Type Name Length [m/ft] Width [m/ft] Draft [m/ft] Lifting capacity [t] Max crane SWL [t] Num. Cranes
Dry dock Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Dry dock Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Slipway Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Outfitting pier Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Deviation cost
Advertisement: