www.trusteddocks.com

Compare Shipyards

Knots
MT per day
USD per MT
USD per day
Shipyard name NAVANTIA - SAN FERNANDO SHIPYARD GIBDOCK
Location
San Fernando, Spain
Gibraltar, Gibraltar
Dimensions Max. Length: 147.0m / 482.3ft  | Max. Width: 22.5m / 73.8ft Max. Length: 272.0m / 892.4ft  | Max. Width: 38.0m / 124.7ft  | Max. Draft: 11.0m / 36.1ft
NAVANTIA - SAN FERNANDO SHIPYARD
GIBDOCK
Services
  • New Buildings
    • Ship Repairs
  • Repairs
    • Dry Dockings
    • Ship Repairs
    • Afloat Repairs
    • Mechanical Services
    • Hydraulic Services
    • Cleaning & Blasting Services
    • Coating Services
    • Steel Fabrication
    • Administration
    • Project Management
Certificates
ISO 9001
ISO 9001
OHSAS 18001
ISO 14001
Description

Located in the southern side of the country, Navantia’s Bay of Cadiz facility is the largest owned by the company (over a million and a half square meters). In this area, Navantia has one of the largest dry-docks in the world with a capacity to build vessels up to 500 meters long and 100 m wide, along with the two largest gantry cranes in Spain. Navantia’s Bay of Cadiz centers are specialized in the construction of ocean-going patrol vessels, large military vessels, fast patrol vessels and special vessels, such as the Coastal Survey Vessels, Oceanic Survey Patrol Vessels, Maritime Action Ships, Combat Support Vessels, etc. In the Bay, which is an obligatory port of pass for maritime traffic between the Atlantic and the Mediterranean, Cadiz-San Fernando Overhaul is equipped with the infrastructure and equipment required to meet any need in the field of overhauls and transformations. The Bay of Cadiz is also home to Navantia’s state-of-the-art system factory (Sistemas), which develops combat systems, weapons, ship control and maritime security systems and other civil application products.more

Gibdock provides the highest standard in shipyard services in one of the most convenient locations in Europe. Located in Gibraltar, between the Atlantic and the Mediterranean, Gibdock offers comprehensive repair, maintenance and conversion in its three dry docks and protected deepwater port. Three dry docks ranging in length from 154 meters to 272 meters supported by 10 cranes make up the flexible core of the yard. A 300 meter main wharf and a 435 meter mole complete Gibdock’s infrastructure. Gibraltar is conveniently located at the crossroads of the Mediterranean and Atlantic shipping lanes. Minimal deviation for ships in these waters, a year round dry climate ideally suited for outdoor ship-work, and fast transport links all make Gibdock the perfect location for shipyard services. A globally connected airport less than 15 minutes from the yard. Fast road access to Southern Spain. Comprehensive local infrastructure for materials, technology and commercial services.more

Facilities
Type Name Length [m/ft] Width [m/ft] Draft [m/ft] Lifting capacity [t] Max crane SWL [t] Num. Cranes
Graving dock Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Graving dock Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Graving dock Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Graving dock Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Type Name Length [m/ft] Width [m/ft] Draft [m/ft] Lifting capacity [t] Max crane SWL [t] Num. Cranes
Graving dock DOCK 1 Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Graving dock DOCK 2 Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Graving dock DOCK 3 Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Repairing berth Main Wharf Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Repairing berth South Mole Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Deviation cost
Advertisement: