www.trusteddocks.com

Compare Shipyards

Knots
MT per day
USD per MT
USD per day
Shipyard name NAVANTIA FERROL FENE SHIPYARD ARMON SHIPYARDS VIGO S.A.
Location
Ferrol, Spain
Vigo - Pontevedra, Spain
Dimensions Max. Length: 330.0m / 1,082.7ft  | Max. Width: 51.0m / 167.3ft Max. Length: 120.0m / 393.7ft
NAVANTIA FERROL FENE SHIPYARD
ARMON SHIPYARDS VIGO S.A.
Services
  • Repairs
    • Dry Dockings
    • Ship Repairs
    • Conversions
    • Refits
    • Afloat Repairs
    • Engine Overhauls
    • Mechanical Services
    • Hydraulic Services
    • Piping & Fitting Services
    • Cleaning & Blasting Services
    • Coating Services
    • Carpentry Services
    • Insulation Services
    • HVAC Services
    • Design & Engineering Services
    • Steel Fabrication
    • Warehousing/Storage
    • Spare Part Service
    • Additional Subcontractor Services
    • Floating Crane Services
    • Mobile Cranage
    • Work Pontoons
    • Diving Services
    • Administration
    • Project Management
    • Procurement
    • Logistics
    • BWTS Installation
    • Scrubber Installation
    • Vessel Upgrades
    • Pipe welding robot
    • Tank Coating
    • UHP wall Crawlers
    • UHP deck Crawlers
    • Abatement Services
    • Fuel Transfer/ Storage
  • New Buildings
Certificates
ISO 9001
Description

Navantia’s Production Units at Ferrol Estuary, with facilities at Fene and Ferrol, have been equipped with world-class state of the art shipbuilding technological means and a revolutionary production model - integrated construction- that allows to achieve top-quality results, while cutting costs and deadlines. In these centers, located in northwestern coast of Spain, Navantia builds next-generation warships, including frigates equipped with the AEGIS combat system, amphibious ships, aircraft carriers, fleet tankers, corvettes, etc. This area is also located the Turbine Factory dedicated to manufacturing steam turbines and wind turbines for power generation plants and reduction gears, shafts lines, torpedo tubes and other equipment for ships. It also maintains an important activity of technical assistance and after sales service. Moreover, Navantia’s Ferrol Estuary facilities are widely known for their ship overhaul and conversion capabilities, thanks to its great capacity for specialized work and excellent technical and human resources. Its overhaul and conversion activity offering includes the repair of LNG and LPG ships, offshore units, chemical tankers and other specialized vessels. Its great capacity for renewal and steel and pipe manufacturing; high quality surface treatment (tank coating), electrical and hydraulic repairs, etc., as well as its repair workshop staffed with highly qualified workers make of Navantia’s Ferrol Estuary center one of the most important repair centers in Europe.more

ASTILLEROS ARMON VIGO, S.A., which was registered in 1999, has 12,000 square meters of compact facilities including an extensive covered slipway with docking for vessels of up to 120 meters in length with a beam of up to 18 meters. It also has another slipway with a capacity of 70 meters, a 180-meter outfitting quay, a boiler shop, an advanced oxy-cutting center, mobile and gantry cranes, auto-cranes and more.more

Facilities
Type Name Length [m/ft] Width [m/ft] Draft [m/ft] Lifting capacity [t] Max crane SWL [t] Num. Cranes
Graving dock Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Graving dock Dry Dock NO.2 Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Graving dock Dry Dock NO.3 Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Graving dock Dry Dock NO.4 Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Graving dock Dry Dock NO.5 Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Type Name Length [m/ft] Width [m/ft] Draft [m/ft] Lifting capacity [t] Max crane SWL [t] Num. Cranes
Slipway Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Slipway Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now. Please log in or register now.
Deviation cost
Advertisement: