Shipyard name |
HARLAND & WOLFF HEAVY INDUSTRIES LIMITED |
CAMMELL LAIRD SHIPREPAIRERS &SHIPBUILDERS LIMITED |
|
Location |
Belfast, United Kingdom
|
Merseyside, United Kingdom
|
|
Dimensions |
Max. Length: unlimited | Max. Width: 93.0m / 305.1ft | Max. Draft: 12.2m / 40.0ft
|
Max. Length: 289.0m / 948.2ft | Max. Width: 43.0m / 141.1ft
|
|
|
|
|
|
Services |
|
|
|
Certificates |
|
|
|
Description |
Founded in 1861 Harland and Wolff are renowned as an innovative engineering company having designed and built some of the world's most beautiful ships. The superb facilities also provide a wide range of services for ship repair and conversion. Being a marine manufacturing expert allowed the development of products specifically designed for the Oil and Gas market.
This experience has recently fuelled the evolution into building structures for the renewable energy market. Harland and Wolff are continually developing new design and manufacturing methods that progress offshore energymore
|
The company was founded in 1828 and is based on the River Mersey in the Liverpool City Region on the west coast of Britain. The company’s Birkenhead site expands across 130 acres and includes four dry docks, a large modular construction hall and extensive covered workshops. It is also at the centre of a marine and engineering cluster with easy access to support services classification societies and port state authorities.
Today the company is rapidly expanding as a cutting edge engineering services specialist. Its highly skilled workforce and extensive world class facilities are used tomore
|
|
Facilities |
Type |
Name |
Length [m/ft] |
Width [m/ft] |
Draft [m/ft] |
Lifting capacity [t] |
Max crane SWL [t] |
Num. Cranes |
Graving dock |
Belfast Dock |
 |
 |
 |
 |
 |
 |
Graving dock |
Main Dock |
 |
 |
 |
 |
 |
 |
|
Type |
Name |
Length [m/ft] |
Width [m/ft] |
Draft [m/ft] |
Lifting capacity [t] |
Max crane SWL [t] |
Num. Cranes |
Graving dock |
NO.4 |
 |
 |
 |
 |
 |
 |
Graving dock |
NO.5 |
 |
 |
 |
 |
 |
 |
Graving dock |
NO.6 |
 |
 |
 |
 |
 |
 |
Graving dock |
NO.7 |
 |
 |
 |
 |
 |
 |
|
|
Deviation cost |
|
|
|