Builder | NEW DAYANG SHIPBUILDING CO., LTD, |
Year of Build | 2017 (8 years old) |
Main Engine | |
Main Engine Builder | |
Scrubber |
Sister Vessels
Name | Type | Length | Width | Last Shipyard | Actual Sailingarea |
---|---|---|---|---|---|
HARVEST 62 | Oil and chemical tanker | 106.75 | 17.0 | South Pacific Ocean | |
KAI EI MARU 15 | Other tanker | 106.0 | 17.0 | South Asia | |
PIONEER 38 | Oil and chemical tanker | 106.75 | 17.3 | Australia/Oceania | |
PROSPERITY 12 | Oil and chemical tanker | 106.75 | 17.3 | South Pacific Ocean |
Current position and nearby shipyards
Visited Shipyards
Management
Dimensions
Length Overall | |
Length Bp | |
Breadth Registered | |
Breadth Moulded | |
Draught | |
Draught Winter | |
Draught Tropical |