Entering the Seaport of Amsterdam
Approaching the Port
As you approach the seaport of Amsterdam, you will first see the iconic windmill at the entrance of the port. This is a clear indication that you are nearing the port and should start preparing for entry.
Communicating with the Port Authority
Before entering the port, it is important to communicate with the port authority. You can do this by contacting the VHF channel 12 or 14 and providing your vessels name, size, and purpose of visit. The port authority will then provide you with instructions on where to dock and any other relevant information.
Navigating the Port
Once you have received instructions from the port authority, you can start navigating the port. The seaport of Amsterdam is a busy port, so it is important to keep a lookout for other vessels and follow the designated shipping lanes.
Docking at the Port
When you reach your designated dock, it is important to approach slowly and carefully. Make sure to follow any instructions provided by the port authority and use proper docking techniques to ensure a safe and secure mooring.
Conclusion
Entering the seaport of Amsterdam requires careful navigation and communication with the port authority. By following these steps, you can safely and efficiently enter the port and enjoy all that Amsterdam has to offer.
在Amsterdam船厂
DAMEN SHIPREPAIR AMSTERDAM
最大船长: 2xx.x m | 最大船宽: 3x.x m | 最大船深: 9.x m | Max. Load: 9x.x t
DAMEN SHIPREPAIR ORANJEWERF
最大船长: 1xx.x m | 最大船宽: 2x.x m | 最大船深: 8.x m | Max. Load: 1x.x t
Amsterdam港口服务
预计到港船只
船舶名称 | 船型 | 长度 | 预计下次检修日期 | 船东 | 预计到港时间 |
---|---|---|---|---|---|
ORIENTAL ACACIA (9553048) | Oil and chemical tanker | ||||
KARLA C (9558012) | General cargo ship | ||||
VIKING SKADI (7001960) | |||||
请 登陆或注册为会员以看到更多信息 |
船期列表
船舶名称 | 船型 | 长度 | 预计下次检修日期 | 船东 | 到港船期 |
---|---|---|---|---|---|
GOLD XING (9308807) | Ro ro cargo ship | ||||
GREAT TEMA (9935038) | Ro ro cargo ship | ||||
请 登陆或注册为会员以看到更多信息 |